English Castellano
  • foto 1

    Stabilization of cut number 4. Section 5. High-speed railway between Cordoba and Malaga
  • foto 2Foundation of Hotel Vela and annex buildings. Barcelona
  • foto 3Cuts in the road between the “Corredor del Nalón” and Cantabrian’s Highway. Asturias
  • foto 4Karstified area that has been filled
  • foto 5130 m long tunnel portal in an abandoned quarry. Highway A-1. Section Eskorriatza-Arrasate
  • foto 6Excavation beside Toledo’s Alcazar for the National Army Museum
  • foto 6Ground treatment and foundation of Liquefied Natural Gas tanks in Manzanillo Harbour. Mexico
........................................................................................................................................................................................................................................................
  Uriel & Asociados  
  Introduction Geotechnical Studies   Large Urban Excavations
  About us Integrated Geotechnical Design   Complete Listing
  International Specialized Consulting   Road and Railway Works
  Clients Revisions for bid and execution construction projects       - Tunnels
  Work Equipments Project supervision       - Bridges
  Contact Project Edition   Special Buildings
    Geotechnical support   Coastal Engineering
  Courses lectured and
papers published
Execution control
  Hydraulic Engineering
Construction pathology studies  

 
Legal notice